SCADA Migration and Real-Time Monitoring for Water Conservation

AstraZeneca's water reuse and conservation system relied on a legacy HMI platform that limited scalability, transparency, and reporting. The project modernized the SCADA platform and communications architecture to improve reliability and operational visibility.

01

The Challenge

AstraZeneca's water reuse and conservation system was constrained by a legacy HMI platform with limited scalability, communication inefficiencies, and no centralized historical reporting.

  • Legacy HMI platform limiting scalability and transparency
  • Communication inefficiencies and performance gaps
  • Limited centralized reporting and historical tracking
  • Opportunity to improve reliability and compliance
02

Why These Projects Are More Complex Than They Appear

Migrating a live water reuse system to a new SCADA platform without disrupting operations required coordinated work across communications, interface design, and reporting infrastructure.

1

System Assessment

Conduct a comprehensive on-site assessment of the existing HMI and communications architecture.

2

Ethernet Architecture Upgrade

Upgrade to an Ethernet-based communications architecture across the system.

3

SCADA & HMI Migration

Migrate the legacy HMI to the Ignition 8.3 SCADA platform.

4

Alarm & Diagnostics Enhancement

Enhance the graphical interface and alarm diagnostics for operators.

5

Historian & Real-Time Dashboards

Implement a centralized data historian with real-time dashboards and historical trending.

6

Automated Reporting & Traceability

Deliver automated reporting and improved operational traceability.

03

Technical Approach

The execution combined a full system assessment, SCADA platform migration, and reporting infrastructure to modernize the water reuse system.

  • Conducted comprehensive on-site system assessment
  • Migrated legacy HMI to Ignition 8.3 SCADA platform
  • Enhanced graphical interface and alarm diagnostics
  • Upgraded to Ethernet-based communications architecture
  • Implemented centralized data historian
  • Developed real-time dashboards and historical trending
  • Automated reporting capabilities
  • Improved system monitoring and operational traceability
04

Project Execution

The project followed a structured path from initial assessment through commissioning and validation.

  1. STEP 01

    Assessment

  2. STEP 02

    Procurement

  3. STEP 03

    Installation

  4. STEP 04

    System Configuration

  5. STEP 05

    Testing & Validation

  6. STEP 06

    Reporting

  7. STEP 07

    Support & Maintenance

05

Key Takeaway

Modernizing a live utility system is as much about communications architecture as it is about the SCADA platform itself—Ethernet upgrades and centralized historian data are what make real-time visibility possible.